Case Study 5
Case study 5 - Water pipe replacement in Iden, Rye. Poor flow due to an old existing iron pipe, meant that this house’s new heating system could not run at its full potential. By replacing the water supply with new 25mm plastic. The flow rate doubled. Now the customer does not lose shower pressure if someone flushes the toilet downstairs.